Control System
-
User Management:
We've seen too many systems where security is an afterthought. Our multi-level access control ensures the right people have the right access:
-Operators can run tests and view results
-Supervisors can modify test parameters and access reports
-Administrators control user accounts and system settings
-Service technicians have calibration and maintenance access
All actions are recorded with precise timestamps and associated user IDs. -
Test Recipe Management :
Different air conditioner models need different test parameters. Our recipe system makes this simple:
-Each model gets its own validated test recipe with pre-set limits and sequences.
-Operators just select the model - the system handles the rest.
- No more manual parameter entry, no more typographical error. We include version control too. Whenever test requirements are modified, the system provides a clear audit trail detailing what changed and when -
Siemens PLC Integration:
A Siemens S7-1200 PLC handles all real-time control functions. If the PC fails, the PLC can safely shut down the test and protect the equipment.
The PLC manages:
- 32 digital inputs for status monitoring
-16 digital outputs for control functions
-8 analog inputs for sensor data
-4 analog outputs for control signals
-High-speed counters for RPM measurement -
Communication Network :
Everything connects via Modbus - a proven industrial protocol that's been reliable for decades. This makes it easy to add new instruments or replace existing ones without major system changes.
Testing Modules
Test Name | Parameters & Description |
Earth Bond Test | 6–10A AC current; resistance limit ≤ 0.1Ω; test result shown on PC |
HV Test | GW-Instek GPT-9803 source; 0–6kV AC/DC with ramp-up/down; trip current (AC: 1–40mA / DC: 1–10mA) |
Insulation Resistance | 500V DC in OFF condition; If the resistance is less than the set value ‘Fail’ indications will be given and test will be terminated. |
Earth Leakage Test | Conducted during Run test; current range: 1–15mA; If the current is more than the set value. Fail Indication will be given & Test will be terminated. |
Performance (RUN) Tests | Sequential testing with RPM sensing, dual pressure transducers, valve actuation. Operational Performance Tests
|